Piney - Timblin substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Piney - Timblin as the point of interconnection, all in Armstrong County, PA.
Target commercial operation dates as filed run from Jun 2024 to May 2026 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-129 | Piney - Timblin 115 kV | 115 | 23.8 | Solar | Withdrawn | May 2026 |
| AH1-372 | Piney - Timblin 115 kV | 115 | 10.9 | Solar | Withdrawn | Jun 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Armstrong County, PA
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Keystone: 4 active, 86 MW of 12 filed
- Timblin: 1 active, 20 MW of 3 filed
- Clementine-Clementine Jct.: none active of 2 filed
- Keystone-Conemaugh: none active of 2 filed
- Kittanning-Rural Valley: none active of 2 filed