Shelocta substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
A44 Shelocta 230 kV 230 402 Gas Withdrawn
AH1-402 Shelocta 115kV 115 55.9 Solar Withdrawn
AH1-403 Shelocta 115kV 115 29.1 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.