Shelocta substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A44 | Shelocta 230 kV | 230 | 402 | Gas | Withdrawn |
| AH1-402 | Shelocta 115kV | 115 | 55.9 | Solar | Withdrawn |
| AH1-403 | Shelocta 115kV | 115 | 29.1 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.