Shelocta substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Shelocta as the point of interconnection, all in Indiana County, PA.
Target commercial operation date as filed: Dec 2024 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| A44 | Shelocta 230 kV | 230 | 402 | Gas | Withdrawn | n/r |
| AH1-402 | Shelocta 115kV | 115 | 55.9 | Solar | Withdrawn | Dec 2024 |
| AH1-403 | Shelocta 115kV | 115 | 29.1 | Battery | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Shelocta (PENELEC, 5 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Indiana County, PA
- Homer City: 2 active, 2,516 MW of 4 filed
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Wayne-Homer City: 1 active, 250 MW of 2 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Keystone: 4 active, 86 MW of 12 filed
- Blairsville East: none active of 2 filed
- Keystone-Conemaugh: none active of 2 filed
- Seward-Glory: none active of 2 filed