Wayne-Homer City substation interconnection queue
1 active project totaling 250 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Wayne-Homer City as the point of interconnection, all in Indiana County, PA.
Target commercial operation date as filed: Jan 2002 (1 filing).
1active projects
250active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| B06 | Wayne-Homer City 345kV | 345 | 525 | Gas | Withdrawn | n/r |
| B05 | Wayne-Homer City 345kV | 345 | 250 | Gas | In Service | Jan 2002 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Indiana County, PA
- Homer City: 2 active, 2,516 MW of 4 filed
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Keystone: 4 active, 86 MW of 12 filed
- Shelocta: none active of 3 filed
- Blairsville East: none active of 2 filed
- Keystone-Conemaugh: none active of 2 filed
- Seward-Glory: none active of 2 filed