Wayne-Homer City substation interconnection queue
1 active project totalling 250 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
250active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| B06 | Wayne-Homer City 345kV | 345 | 525 | Gas | Withdrawn |
| B05 | Wayne-Homer City 345kV | 345 | 250 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.