Wayne-Homer City substation interconnection queue

1 active project totalling 250 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatus
B06 Wayne-Homer City 345kV 345 525 Gas Withdrawn
B05 Wayne-Homer City 345kV 345 250 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.