Jack Frost-Lake Harmony substation interconnection queue
1 active project totaling 39.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Jack Frost-Lake Harmony as the point of interconnection, all in Carbon County, PA.
Target commercial operation dates as filed run from Dec 2024 to Aug 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
39.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-156 | Mora Solar | 69 | 39.5 | Solar | Engineering and Procurement | Aug 2028 |
| AG2-174 | Jack Frost-Lake Harmony 69 kV | 69 | 13.2 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Carbon County, PA
- Harwood: 2 active, 300 MW of 5 filed
- Siegfried-Hauto: 4 active, 8.8 MW of 5 filed
- East Palmerton-Harwood: none active of 2 filed
- Weissport: none active of 2 filed