Siegfried-Hauto substation interconnection queue

4 active projects totaling 8.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).

5 PJM queue filings name Siegfried-Hauto as the point of interconnection, all in Carbon County, PA.

Target commercial operation dates as filed run from Dec 2012 to Dec 2021 (5 filings).

4active projects
8.8active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-087 PA Solar Park 69 3.8 Solar In Service Dec 2021
U4-014 PA SP 69 3.8 Solar In Service Dec 2012
V3-040 PA SP 69 3.8 Solar Withdrawn Jun 2016
AE2-274 PA Solar Park 69 0.8 Solar In Service Dec 2021
AE2-273 PA Solar Park 69 0.4 Solar In Service Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Carbon County, PA

All 24 PJM queue filings in Carbon County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first