Carbon, PA interconnection queue

6 active projects totalling 74.5 MW in the PJM queue, plus 18 with terminal status (shown greyed).

6active projects
74.5active MW
24total filed
Queue IDProjectkVMWResourceStatus
AH1-448 East Palmerton-Harwood 230 kV 230 180 Hybrid Withdrawn
V3-004 Siegfried n/r 83 Coal Withdrawn
AI1-038 Harwood-Siegfried 230kV II 230 61.9 Solar Withdrawn
AG1-156 Mora Solar 69 39.5 Solar Engineering and Procurement
AA1-103 Harwood-Siegfried 230kV 230 27 Wind Withdrawn
Z2-007 East Palmerton-Harwood 230kV 230 27 Wind Withdrawn
AG2-074 Meckesville Tap 69kV 69 26.2 Solar Active
N51 Harwood 230kV 230 20 Wind Withdrawn
AI2-062 Jack Frost - Lake Harmony 69 kV 69 18.3 Solar Withdrawn
AG2-652 Siegfried-Hauto 69 kV IV 69 13.9 Solar Withdrawn
AG2-174 Jack Frost-Lake Harmony 69 kV 69 13.2 Solar Withdrawn
Z2-008 East Palmerton-Wagner 69kV 69 12.9 Wind Withdrawn
AA2-017 Penn Forest Wind Project 69 12.7 Wind Withdrawn
R06 Weissport 69kV 69 12 Wind Withdrawn
AD1-143 Broad Mountain 69 11.8 Hybrid Withdrawn
AG2-653 Siegfried-Hauto 69 kV V 69 8 Battery Withdrawn
AA1-114 Harwood-East Hazelton #2 69kV 69 7.7 Wind Withdrawn
AC1-087 PA Solar Park 69 3.8 Solar In Service
U4-014 PA SP 69 3.8 Solar In Service
V3-040 PA SP 69 3.8 Solar Withdrawn
U2-054 Beltzville Hydro Dam n/r 2.6 Hydro Withdrawn
AE2-274 PA Solar Park 69 0.8 Solar In Service
AG2-157 Ashfield 12 kV 12 0.8 Solar Withdrawn
AE2-273 PA Solar Park 69 0.4 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.