East Palmerton-Harwood substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name East Palmerton-Harwood as the point of interconnection, all in Carbon County, PA.
Target commercial operation dates as filed run from Jun 2015 to Dec 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-448 | East Palmerton-Harwood 230 kV | 230 | 180 | Hybrid | Withdrawn | Dec 2024 |
| Z2-007 | East Palmerton-Harwood 230kV | 230 | 27 | Wind | Withdrawn | Jun 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Carbon County, PA
- Harwood: 2 active, 300 MW of 5 filed
- Jack Frost-Lake Harmony: 1 active, 39.5 MW of 2 filed
- Siegfried-Hauto: 4 active, 8.8 MW of 5 filed
- Weissport: none active of 2 filed