Substation Scout

East Palmerton-Harwood substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-448 East Palmerton-Harwood 230 kV 230 180 Hybrid Withdrawn
Z2-007 East Palmerton-Harwood 230kV 230 27 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.