Spruance NUG substation interconnection queue
2 active projects totaling 20 MW in the PJM queue.
2 PJM queue filings name Spruance NUG as the point of interconnection, all in VA.
Target commercial operation dates as filed run from May 2019 to Dec 2025 (2 filings).
Transmission owner as filed: Dominion (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-097 | Spruance Operating Services LLC | 230 | 11 | Gas | In Service | May 2019 |
| AH1-108 | Spruance NUG 230 kV | 230 | 9 | Gas | Active | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Spruance NUG (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Henrico County, VA
Other PJM queue substations in City of Richmond, VA
- Garner-Northern Neck: 3 active, 145.4 MW of 6 filed
- Plaza: none active of 2 filed