Richmond, VA interconnection queue
3 active projects totalling 105.2 MW in the PJM queue, plus 8 with terminal status (shown greyed).
3active projects
105.2active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-183 | DuPont - Marlboro 115 kV | 115 | 130 | Battery | Withdrawn |
| AI1-031 | Westmoreland - Oak Grove 230kV | 230 | 100 | Battery | Withdrawn |
| C01-1106 | Moon Corner 115 kV | 115 | 88 | Battery | Withdrawn |
| AI2-279 | Garner-Northern Neck 115 kV | 115 | 43 | Battery | Withdrawn |
| AF2-036 | Garner-Northern Neck 115 kV | 115 | 37.2 | Solar | Withdrawn |
| AF2-120 | Cerulean Solar and Mulberry BESS | 115 | 37.2 | Solar | UC-ISP |
| AG1-135 | Moon Corner Solar | 115 | 36 | Solar | UC-ISP |
| AG1-536 | Cerulean Solar and Mulberry BESS | 115 | 32 | Battery | EP |
| C01-1104 | Robley 115 kV | 115 | 30 | Battery | Withdrawn |
| AH1-134 | Northern Neck 230 kV | 230 | 12 | Battery | Withdrawn |
| AG1-210 | Haynesville Energy Storage | 34.5 | 4 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.