City of Richmond, VA interconnection queue
2 active projects totalling 85.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
85.2active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-155 | Bookers Mill Solar | 115 | 76.2 | Solar | In Service |
| AH2-026 | Not reported | n/r | 72 | Battery | Withdrawn |
| S81 | Bellemeade | 230 | 22 | Gas | Deactivated |
| AH1-108 | Spruance NUG 230 kV | 230 | 9 | Gas | Active |
| AG1-064 | Bermuda Energy | 34.5 | 8 | Battery | Withdrawn |
| AG1-065 | Bermuda Energy | 34.5 | 8 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.