City of Richmond, VA interconnection queue

2 active projects totalling 85.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
85.2active MW
6total filed
Queue IDProjectkVMWResourceStatus
AE1-155 Bookers Mill Solar 115 76.2 Solar In Service
AH2-026 Not reported n/r 72 Battery Withdrawn
S81 Bellemeade 230 22 Gas Deactivated
AH1-108 Spruance NUG 230 kV 230 9 Gas Active
AG1-064 Bermuda Energy 34.5 8 Battery Withdrawn
AG1-065 Bermuda Energy 34.5 8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.