Substation Scout

Erie West 345 kV

PJM queue ID C01-2241

Erie West 345 kV (C01-2241) is listed in the PJM interconnection queue as a merchant transmission request for 1,100 MW in Erie County, PA. The filing names Erie West as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2031.

Queue IDC01-2241
Project nameErie West 345 kV
Status (as published)Active
SubstationErie West
Point of interconnectionErie West 345 kV
CountyErie
StatePA
Voltage345 kV
Capacity1,100 MW
Resource (as published)Not reported
Resource categoryNot reported (normalized for filtering)
Target commercial operation2031-12-01
Source datasetcycle

Same substation and county

Erie West substation: 7 requests in the PJM queue, 1 active totaling 1,100 MW.

Queue IDProjectMWResourceStatus
G00_MTX3Erie West 345kV1,000Not reportedWithdrawn
Y3-092ITC Lake Erie Connector1,000Not reportedWithdrawn
Y3-093Erie West 345kV1,000Not reportedWithdrawn
A38Erie West 345 kV765GasWithdrawn
AB2-019Erie West 345kV28Not reportedWithdrawn
AF1-104Elder West20HybridWithdrawn

Erie, PA: 42 requests in the PJM queue, 7 active totaling 1,217.4 MW.

A substation with the same name is named in PJM transmission planning materials: Erie West (PENELEC, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLake Erie Connector Transmission, LLC
Transmission ownerPENELEC
Project typeMerchant Transmission
CycleC01
StagePhase 1
MW energy0.0
MW capacity1100.0
MFO1133.0
Submitted date4/27/2026
Last updated6/17/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.