Fairview East substation interconnection queue

1 active project totalling 12.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
12.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-006 Erie Solar 34.5 12.8 Solar In Service
AI2-056 Fairview East 34.5 kV 34.5 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.