Erie East substation interconnection queue

1 active project totalling 32 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
32active MW
6total filed
Queue IDProjectkVMWResourceStatus
C10 Northeast Cogen 230 100 Gas Withdrawn
AE2-299 Erie East Energy 230 32 Battery Suspended
X2-020 Erie East 230 kV 230 26 Wind Withdrawn
X2-021 Erie East 230kV 230 20 Wind Withdrawn
Y1-031 Erie East 230kV 230 13.2 Wind Withdrawn
Y3-062 North East Wind Farm 34.5 2.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.