Erie West - Ashtabula substation interconnection queue

1 active project totalling 300 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2042 Erie West - Ashtabula 345 kV 345 300 Battery Active
C01-1871 Erie West - Ashtabula 345 kV 345 198.6 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.