Substation Scout

Erie, PA interconnection queue

9 active projects totalling 1,549.4 MW in the PJM queue, plus 33 with terminal status (shown greyed).

9active projects
1,549.4active MW
42total filed
Queue IDProjectkVMWResourceStatus
C01-2241 Erie West 345 kV 345 1,100 Not reported Active
G00_MTX3 Erie West 345kV 345 1,000 Not reported Withdrawn
Y3-092 ITC Lake Erie Connector 345 1,000 Not reported Withdrawn
Y3-093 Erie West 345kV 345 1,000 Not reported Withdrawn
B50 Morgantown 69kV 69 500 Gas Withdrawn
M15 Union City 230kV 230 301.5 Gas Withdrawn
C01-2042 Erie West - Ashtabula 345 kV 345 300 Battery Active
H22 Erie South n/r 300 Gas Withdrawn
AI1-188 Buffalo 115 kV 115 130 Battery Withdrawn
C10 Northeast Cogen 230 100 Gas Withdrawn
S66 Downing Avenue 115kV 115 96 Other Withdrawn
E14 Elm St. 115 kV 115 70 Gas Withdrawn
AF1-098 Wilson Solar 115 48 Solar Engineering and Procurement
AF2-010 Union Solar 115 46 Solar Withdrawn
AG1-548 French Creek Solar and BESS 115 45 Hybrid EP
AG2-008 Erie South-Warren 230 kV 230 40.2 Solar Withdrawn
AE2-299 Erie East Energy 230 32 Battery Suspended
X2-020 Erie East 230 kV 230 26 Wind Withdrawn
AF1-104 Elder West 34.5 20 Hybrid Withdrawn
X2-021 Erie East 230kV 230 20 Wind Withdrawn
W3-099 Greenfield Wind Farm 230 13 Wind Withdrawn
AG2-009 Erie South-Warren 230 kV II 230 12.9 Solar Withdrawn
AF1-006 Erie Solar 34.5 12.8 Solar In Service
AF2-170 Erie West-Springboro 34.5 kV 34.5 12 Solar Withdrawn
AH1-491 Waterford Solar 1 34.5 12 Solar Withdrawn
AH1-331 McLane Solar 25 11.9 Solar Withdrawn
AG2-039 Erie West-Fairview East 34.5 kV 34.5 11.8 Solar Withdrawn
AG1-198 Union City 34.5 kV 34.5 7.2 Solar In Service
AG2-438 Union City 34.5 kV 34.5 6.7 Solar Withdrawn
AG2-353 Hammett 12.47 kV 12.5 6.5 Solar Withdrawn
AI2-481 Union City - French Road 12.5kV 12.5 5.8 Solar Withdrawn
AI2-320 Edinboro South - Erie South 25 kV 25 5.1 Solar Withdrawn
AI2-056 Fairview East 34.5 kV 34.5 3.8 Solar Withdrawn
AI1-030 Corry East - Garland Jct 34.5 kV 34.5 3.4 Solar Withdrawn
AH2-014 Crane Solar 34.5 kV 34.5 3.3 Solar Withdrawn
AF2-097 Fairview East 34.5 kV II 34.5 3 Solar Withdrawn
AG1-253 Greenfield CSG 1 34.5 2.7 Solar Suspended
Y3-062 North East Wind Farm 34.5 2.4 Wind Withdrawn
Y3-111 Harborcreek Township 34kV 34 2.4 Wind Withdrawn
U4-047 Mill Village 34.5kV 34.5 2 Other Withdrawn
V3-019 Edinboro 13.8kV 13.8 2 Gas Withdrawn
AG1-140 Great Lake Growers 34.5 1.7 Solar Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.