Substation Scout

Gaucho Solar

PJM queue ID AD1-135

Gaucho Solar (AD1-135) is listed in the PJM interconnection queue as a 3.2 MW solar project in Washington County, PA. The filing names Clinton II as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2023.

Queue IDAD1-135
Project nameGaucho Solar
Status (as published)In Service
SubstationClinton II
Point of interconnectionClinton 23 kV II
CountyWashington
StatePA
Voltage23 kV
Capacity3.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-06-01
Source datasetserial

Same substation and county

Clinton II substation: 2 requests in the PJM queue, 1 active totaling 3.2 MW.

Queue IDProjectMWResourceStatus
AG2-417Clinton 69 kV II88HybridWithdrawn

Washington, PA: 27 requests in the PJM queue, 8 active totaling 2,424.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8.3
MW capacity3.15
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first