McKean, PA interconnection queue

4 active projects totalling 502.2 MW in the PJM queue, plus 17 with terminal status (shown greyed).

4active projects
502.2active MW
21total filed
Queue IDProjectkVMWResourceStatus
C01-1339 Pierce Brook - Lewis Run 230 kV 230 200 Hybrid Active
C01-1172 Farmers Valley - Ridgeway 115 kV 115 180 Hybrid Active
AH1-589 Wild Sky Storage 230 170 Solar Withdrawn
AH1-588 McKean County Solar II 230 144 Solar Withdrawn
AF2-062 Lewis Run-Pierce Brook 230 kV 230 120 Solar Withdrawn
AH1-587 Wild Hollow Solar 115 120 Solar Withdrawn
AI2-063 Lewis Run-Pierce Brook 230 kV 230 82.5 Solar Withdrawn
AF1-276 Lewis Run-Pierce Brook 230 kV 230 67 Solar Withdrawn
AF1-277 Lewis Run-Pierce Brook 2 230 kV 230 67 Solar Withdrawn
AE2-113 Clermont Solar 115 61.9 Solar Under Construction
AE2-139 Bradford Solar 230 60.3 Solar Engineering and Procurement
AG2-456 Pierce Brook-Lewis Run 230 kV 230 55.8 Solar Withdrawn
AG2-457 Pierce Brook - Lewis Run 230 kV 230 55.8 Solar Withdrawn
AF2-052 Farmers Valley-Ridgeway 115 kV 115 37 Solar Withdrawn
AH1-358 McKean Solar 1 - Energy Storage 230 20 Battery Withdrawn
AH1-360 McKean Solar 2 - Energy Storage 230 20 Battery Withdrawn
U3-013 Clermont 115kV 115 16.3 Wind Withdrawn
Y1-028 Lewis Run 115kV 115 16.3 Wind Withdrawn
AH1-357 McKean Solar 1 - 20 MW 230 12 Solar Withdrawn
AH1-359 McKean Solar 2 - 20 MW 230 12 Solar Withdrawn
U3-012 Bradford 115kV 115 11 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.