Farmers Valley - Ridgeway substation interconnection queue

1 active project totalling 180 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
180active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1172 Farmers Valley - Ridgeway 115 kV 115 180 Hybrid Active
AH1-587 Wild Hollow Solar 115 120 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.