Pierce Brook - Lewis Run substation interconnection queue

1 active project totalling 200 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
200active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1339 Pierce Brook - Lewis Run 230 kV 230 200 Hybrid Active
AG2-457 Pierce Brook - Lewis Run 230 kV 230 55.8 Solar Withdrawn
AH1-360 McKean Solar 2 - Energy Storage 230 20 Battery Withdrawn
AH1-359 McKean Solar 2 - 20 MW 230 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.