Substation Scout

Pierce Brook-Lewis Run substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-456 Pierce Brook-Lewis Run 230 kV 230 55.8 Solar Withdrawn
AH1-358 McKean Solar 1 - Energy Storage 230 20 Battery Withdrawn
AH1-357 McKean Solar 1 - 20 MW 230 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.