Substation Scout

Lewis Run - Pierce Brook substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-589 Wild Sky Storage 230 170 Solar Withdrawn
AH1-588 McKean County Solar II 230 144 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.