Lewis Run-Pierce Brook substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-062 | Lewis Run-Pierce Brook 230 kV | 230 | 120 | Solar | Withdrawn |
| AI2-063 | Lewis Run-Pierce Brook 230 kV | 230 | 82.5 | Solar | Withdrawn |
| AF1-276 | Lewis Run-Pierce Brook 230 kV | 230 | 67 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.