Substation Scout

John Day Substation at substation interconnection queue

1 active project totalling 191 MW in the BPA queue, plus 7 with terminal status (shown greyed).

1active projects
191active MW
8total filed
Queue IDProjectkVMWResourceStatus
G0983 Not reported 500 1,200 Solar WITHDRAWN
G0949 Not reported 500 650 Battery WITHDRAWN
G0950 Not reported 500 650 Battery WITHDRAWN
G0951 Not reported 500 650 Battery WITHDRAWN
G0952 Not reported 500 650 Battery WITHDRAWN
G0981 Not reported 500 300 Wind WITHDRAWN
G0982 Not reported 500 300 Wind WITHDRAWN
G0980 Not reported 500 191 Wind STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.