Substation Scout

Boardman Substation substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0240 Not reported n/r 202 Wind WITHDRAWN
G0241 Not reported n/r 202 Wind WITHDRAWN
G0666 Not reported 115 4 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.