New substation on McNary-HPP Line substation interconnection queue

1 active project totalling 238 MW in the BPA queue, plus 3 with terminal status (shown greyed).

1active projects
238active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0403 Not reported 500 302 Wind WITHDRAWN
G0404 Not reported 500 302 Wind WITHDRAWN
G0435 Not reported 500 238 Wind STUDY COMPLETED
G0428 Not reported 500 201 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.