Buckley Substation substation interconnection queue
4 active projects totalling 900 MW in the BPA queue, plus 2 with terminal status (shown greyed).
4active projects
900active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0874 | Not reported | n/r | 500 | Solar | WITHDRAWN |
| G0931 | Not reported | n/r | 500 | Solar | WITHDRAWN |
| G0866 | Not reported | n/r | 300 | Solar | STUDY |
| G0714 | Not reported | 500 | 200 | Solar | STUDY |
| G0715 | Not reported | 500 | 200 | Solar | STUDY |
| G0865 | Not reported | n/r | 200 | Solar | STUDY |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.