1 active project totalling 650 MW in the BPA queue, plus 2 with terminal status (shown greyed).

1active projects
650active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0960 Not reported 230 650 Solar WITHDRAWN
G0962 Not reported 230 650 Solar WITHDRAWN
G0963 Not reported 230 650 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.