Substation Scout

New Substation near John Day Substation substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0323 Not reported 500 300 Wind WITHDRAWN
G0235 Not reported 500 200 Wind WITHDRAWN
G0237 Not reported 500 100 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.