Ashe-Marion No 2 line. substation interconnection queue

1 active project totalling 500 MW in the BPA queue, plus 4 with terminal status (shown greyed).

1active projects
500active MW
5total filed
Queue IDProjectkVMWResourceStatus
G0864 Not reported 500 500 Battery STUDY
G1041 Not reported 500 500 Wind WITHDRAWN
G0939 Not reported 500 400 Solar WITHDRAWN
G0940 Not reported 500 300 Solar WITHDRAWN
G1042 Not reported 500 300 Battery WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.