0 active projects totalling 0 MW in the BPA queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G107 Ib 500 200 Wind WITHDRAWN
G109-01 Iberdrola Renewables Inc 500 100 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.