1 active project totalling 300 MW in the BPA queue, plus 4 with terminal status (shown greyed).

1active projects
300active MW
5total filed
Queue IDProjectkVMWResourceStatus
G0610 Not reported 500 450 Solar WITHDRAWN
G0751 Not reported 500 412.5 Battery WITHDRAWN
G0768 Not reported 500 300 Wind STUDY
G113 RES North America LLC n/r 250 Wind WITHDRAWN
G0207 Not reported 230 200 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.