Substation Scout

BPA's Slatt Substation substation interconnection queue

3 active projects totalling 850 MW in the BPA queue, plus 2 with terminal status (shown greyed).

3active projects
850active MW
5total filed
Queue IDProjectkVMWResourceStatus
G118 Shepherds Flat 500 750 Wind ENERGIZED
G0530 Not reported n/r 600 Gas WITHDRAWN
G0531 Not reported n/r 400 Gas WITHDRAWN
G0713 Not reported n/r 100 Solar STUDY
G0709 Not reported 230 0 Battery STUDY COMPLETED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.