Slatt Substation substation interconnection queue

3 active projects totalling 609 MW in the BPA queue, plus 2 with terminal status (shown greyed).

3active projects
609active MW
5total filed
Queue IDProjectkVMWResourceStatus
G0380 Carty CCCT 500 413 Gas ENERGIZED
G0677 Not reported 500 400 Solar WITHDRAWN
G0706 Not reported n/r 100 Solar STUDY
G0291 Shepherds Flat Wind Farm addition 500 96 Wind ENERGIZED
G0454 Not reported n/r 20 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.