Substation Scout

BPA’s Boardman – Alkali transmission line. substation interconnection queue

1 active project totalling 0 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0707 Not reported 115 0 Battery WITHDRAWN
G0708 Not reported 115 0 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.