Jones Canyon Substation substation interconnection queue

3 active projects totalling 491 MW in the BPA queue, plus 1 with terminal status (shown greyed).

3active projects
491active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0226 Leaning Juniper II n/r 200 Wind ENERGIZED
G0230 Not reported 230 200 Wind WITHDRAWN
G95 Arlington Wind_Wheatfield Wind n/r 200 Wind ENERGIZED
G0917 Leaning Juniper II A Wind Farm n/r 91 Wind ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.