Discovery
Named in 1 PJM planning document for 1 project, on December 5, 2023.
Work described at itdescribed as
DOMzone
—kV as printed
1mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
Part of a named transmission project: 2022 Window 3 Northern Virginia/Doubs Cluster ($1,418.3M).
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| 2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster B3800.200 – B3800.227 |
Not printed | $1025.06 M | 6/1/2028 | Not printed | 2023-12-05 TEAC |
Other substations in this project
“2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster” also names 12 other substations, with what the most recent document says about each.
- Aspen DOM New — “Construct a new Aspen 500/230kV substation” (p. 41)
- Beaumeade DOM Work described at it — “Replace overdutied breakers at Belmont, BECO, Beaumeade” (p. 41)
- Beco DOM Work described at it — “Equipment upgrades at the following substations: – Paragon Park, BECO” (p. 41)
- Belmont DOM Work described at it — “Replace overdutied breakers at Belmont” (p. 41)
- Golden DOM New — “Construct a new Golden 500/230kV substation” (p. 41)
- Goose Creek DOM Expansion
- Lockridge DOM Work described at it
- Mars DOM Work described at it — “Install the 2nd 500-230 kV 1440 MVA transformer at Mars Substation” (p. 41)
- Paragon Park DOM Work described at it — “Equipment upgrades at the following substations: – Paragon Park, BECO” (p. 41)
- Pleasant View DOM Work described at it — “Replace overdutied breakers at Belmont, BECO, Beaumeade, Pleasant View” (p. 41)
- Shellhorn DOM Work described at it — “Replace overdutied breakers at Belmont, BECO, Beaumeade, Pleasant View, Shellhorn” (p. 41)
- Sycolin Creek DOM New
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2023-12-05 | TEAC Item 15 - Reliability Analysis Update 2022 Window 3 p. 41 |
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster | “Replace overdutied breakers at Belmont, BECO, Beaumeade, Pleasant View, Shellhorn, and Discovery.” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.