Occoquan
Named in 1 PJM planning document for 2 projects, on November 3, 2026.
State: VA (from the PJM queue page with the same name and utility, linked below).
Also printed as: Occoquan Substation
PJM interconnection queue
A PJM queue substation page has the same name: Occoquan (VA) — 5 queue requests filed, 2 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2021-0016-DNH (Update) |
Engineering | 138.5 M | 06/01/2029 | Not printed | 2026-11-03 TEAC |
| Dominion Transmission Zone: Supplemental Customer Load Request DOM-2025-0059 |
Engineering | $5.32M | 12/31/2028 | 84MW | 2026-11-03 TEAC |
Other substations in these projects
The 2 projects above also name 14 other substations, with what the most recent document says about each.
- Possum Point DOM, VA Work described at it (in 2 of the 2 projects)
- Beaumeade DOM Work described at it (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Belmont DOM Work described at it (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Braddock DOM Not stated (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Clark DOM Not stated (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Goose Creek DOM Expansion — “Extend the existing 500kV ring bus at Goose Creek Substation” (p. 9) (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Harrowgate DOM Not stated (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Hayfield DOM Work described at it (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Idylwood DOM Not stated (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Locks DOM Work described at it (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Odgen Martin DOM Not stated (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Pleasant View DOM Work described at it — “Upgrade 230kV Pleasant View breakers” (p. 17) (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
- Powell Creek DOM New — “new substation (Powell Creek)” (p. 12) (in Dominion Transmission Zone: Supplemental Customer Load Request)
- Tyler DOM Not stated (in Dominion Transmission Zone: Supplemental Do No Harm Analysis)
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate | 138.5 M → $40.0 M | 2026-11-03 | Not reported |
| Cost estimate | $40.0 M → 138.5 M | 2024-10-08 | 2026-11-03 |
| Cost estimate prior value printed on the same page |
$84.9 M → 138.5 M | 2026-11-03 | 2026-11-03 |
| In-service date | 06/01/2029 → 12/15/2023 | 2026-11-03 | Not reported |
| In-service date | 12/15/2023 → 06/01/2029 | 2024-10-08 | 2026-11-03 |
| Status | engineering (Engineering) → in-service (In-Service) | 2026-11-03 | Not reported |
| Status | in-service (In-Service) → engineering (Engineering) | 2024-10-08 | 2026-11-03 |
| Substations named | BRADDOCK; HAYFIELD; OCCOQUAN; ODGEN MARTIN; POSSUM POINT → BEAUMEADE; BELMONT; CLARK; GOOSE CREEK; HARROWGATE; IDYLWOOD; LOCKS; PLEASANT VIEW; TYLER | 2026-11-03 | Not reported |
| Substations named | BEAUMEADE; BELMONT; CLARK; GOOSE CREEK; HARROWGATE; IDYLWOOD; LOCKS; PLEASANT VIEW; TYLER → BRADDOCK; HAYFIELD; OCCOQUAN; ODGEN MARTIN; POSSUM POINT | 2024-10-08 | 2026-11-03 |
| Substations named | POWELL CREEK → OCCOQUAN; POSSUM POINT; POWELL CREEK | 2025-11-04 | 2026-11-03 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-11-03 | TEAC Item 08 - DOM Supplemental Projects - Presentation p. 11 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis | “leads) at Occoquan Substation” 500 kV |
| 2026-11-03 | TEAC Item 08 - DOM Supplemental Projects - Presentation p. 13 |
Dominion Transmission Zone: Supplemental Customer Load Request | No role wording |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.