Odgen Martin
Named in 1 PJM planning document for 1 project, on November 3, 2026.
Not stateddescribed as
DOMzone
—kV as printed
1mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2021-0016-DNH (Update) |
Engineering | 138.5 M | 06/01/2029 | Not printed | 2026-11-03 TEAC |
Other substations in this project
“Dominion Transmission Zone: Supplemental Do No Harm Analysis” also names 13 other substations, with what the most recent document says about each.
- Beaumeade DOM Work described at it
- Belmont DOM Work described at it
- Braddock DOM Not stated
- Clark DOM Not stated
- Goose Creek DOM Expansion — “Extend the existing 500kV ring bus at Goose Creek Substation” (p. 9)
- Harrowgate DOM Not stated
- Hayfield DOM Work described at it
- Idylwood DOM Not stated
- Locks DOM Work described at it
- Occoquan DOM, VA Work described at it — “leads) at Occoquan Substation” (p. 11)
- Pleasant View DOM Work described at it — “Upgrade 230kV Pleasant View breakers” (p. 17)
- Possum Point DOM, VA Work described at it
- Tyler DOM Not stated
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate | 138.5 M → $40.0 M | 2026-11-03 | Not reported |
| Cost estimate | $40.0 M → 138.5 M | 2024-10-08 | 2026-11-03 |
| Cost estimate prior value printed on the same page |
$84.9 M → 138.5 M | 2026-11-03 | 2026-11-03 |
| In-service date | 06/01/2029 → 12/15/2023 | 2026-11-03 | Not reported |
| In-service date | 12/15/2023 → 06/01/2029 | 2024-10-08 | 2026-11-03 |
| Status | engineering (Engineering) → in-service (In-Service) | 2026-11-03 | Not reported |
| Status | in-service (In-Service) → engineering (Engineering) | 2024-10-08 | 2026-11-03 |
| Substations named | BRADDOCK; HAYFIELD; OCCOQUAN; ODGEN MARTIN; POSSUM POINT → BEAUMEADE; BELMONT; CLARK; GOOSE CREEK; HARROWGATE; IDYLWOOD; LOCKS; PLEASANT VIEW; TYLER | 2026-11-03 | Not reported |
| Substations named | BEAUMEADE; BELMONT; CLARK; GOOSE CREEK; HARROWGATE; IDYLWOOD; LOCKS; PLEASANT VIEW; TYLER → BRADDOCK; HAYFIELD; OCCOQUAN; ODGEN MARTIN; POSSUM POINT | 2024-10-08 | 2026-11-03 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-11-03 | TEAC Item 08 - DOM Supplemental Projects - Presentation p. 11 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis | No role wording |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.
Site Scanner