Hayden substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF1-144 Hayden Run 345 66.9 Solar Withdrawn
AG1-042 Hayden 345 kV 345 66.9 Solar Withdrawn
AH1-270 Hayden 345 kV 345 51 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.