Crittenden substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2017 to Dec 2020 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-007 | Crittenden 34.5kV | 34.5 | 3.8 | Solar | Withdrawn | Dec 2017 |
| AF2-098 | Crittenden 12 kV | 12 | 0 | Battery | Withdrawn | Dec 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Isle of Wight County, VA
- Septa: 2 active, 336.4 MW of 4 filed
- Ivor-Oak Ridge: 1 active, 32.3 MW of 2 filed
- Myrtle-Windsor: 2 active, 16 MW of 4 filed
- Smithfield: 1 active, 12 MW of 3 filed
- Poolesville: none active of 8 filed
- Poolesville-Winchester: none active of 2 filed
- Smithfield-Surry: none active of 2 filed
Other PJM queue substations in Grant County, KY
- Williamstown: 1 active, 0.6 MW of 6 filed