Substation Scout

Crittenden substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC1-007 Crittenden 34.5kV 34.5 3.8 Solar Withdrawn
AF2-098 Crittenden 12 kV 12 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.