Substation Scout

Waverly 115 kV

PJM queue ID C01-1224

Waverly 115 kV (C01-1224) is listed in the PJM interconnection queue as a 80 MW battery project in Sussex County, VA. The filing names Waverly as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 15, 2031.

Queue IDC01-1224
Project nameWaverly 115 kV
Status (as published)Active
SubstationWaverly
Point of interconnectionWaverly 115 kV
CountySussex
StateVA
Voltage115 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-09-15
Source datasetcycle

Same substation and county

Waverly substation: 3 requests in the PJM queue, 1 active totaling 80 MW.

Queue IDProjectMWResourceStatus
AG2-427Waverly 115 kV66.3HybridWithdrawn
AF1-308Waverly 138 kV36SolarWithdrawn

Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperOld Forty Road Solar, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy80.0
MW capacity80.0
MFO80.0
Submitted date4/24/2026
Last updated5/28/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.