Pike, OH interconnection queue

2 active projects totalling 300 MW in the PJM queue, plus 7 with terminal status (shown greyed).

2active projects
300active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-1729 Don Marquis Substation 345 kV 345 150 Nuclear Withdrawn
C01-1730 Don Marquis - Biers Run 345 kV 345 150 Nuclear Active
C01-1737 DOE X530 345 kV 345 150 Nuclear Withdrawn
C01-1738 Don Marquis - Biers Run 345 kV 345 150 Nuclear Active
AC1-150 Beaver 138kV 138 76 Solar Withdrawn
AE2-179 Lick-Waverly 115kV 115 46.8 Solar Withdrawn
AF1-308 Waverly 138 kV 138 36 Solar Withdrawn
AC2-030 East Beaver 69kV 69 13.3 Solar Withdrawn
AH1-531 Salyers Rd 34.5 kV 34.5 12.6 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.