Kyger Creek - Pierce substation interconnection queue

1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Kyger Creek - Pierce as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Jan 2027 to Jan 2030 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: OVEC (1 filing).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1738 Kyger Creek - Pierce 345 kV 345 150 Nuclear Active Jan 2030
AI1-151 Kyger Creek - Pierce 345 kV 345 31.9 Solar Withdrawn Jan 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Pike County, OH

All 9 PJM queue filings in Pike County, OH.

Other PJM queue substations in Adams County, OH

All 21 PJM queue filings in Adams County, OH.