Kyger Creek - Pierce substation interconnection queue
1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Kyger Creek - Pierce as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Jan 2027 to Jan 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: OVEC (1 filing).
1active projects
150active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1738 | Kyger Creek - Pierce 345 kV | 345 | 150 | Nuclear | Active | Jan 2030 |
| AI1-151 | Kyger Creek - Pierce 345 kV | 345 | 31.9 | Solar | Withdrawn | Jan 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.