Great Lake Growers
PJM queue ID AG1-140
Great Lake Growers (AG1-140) is listed in the PJM interconnection queue as a 1.7 MW solar project in Erie County, PA. The filing names Union City as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2024.
| Queue ID | AG1-140 |
|---|---|
| Project name | Great Lake Growers |
| Status (as published) | Suspended |
| Substation | Union City |
| Point of interconnection | Union City 34.5 kV |
| County | Erie |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 1.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-12-31 |
| Source dataset | serial |
Same substation and county
Union City substation: 6 requests in the PJM queue, 2 active totaling 8.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-198 | Union City 34.5 kV | 7.2 | Solar | In Service |
| M15 | Union City 230kV | 301.5 | Gas | Withdrawn |
| AG1-177 | Union City 34.5 kV | 12 | Solar | Withdrawn |
| AH1-491 | Waterford Solar 1 | 12 | Solar | Withdrawn |
| AG2-438 | Union City 34.5 kV | 6.7 | Solar | Withdrawn |
Erie, PA: 42 requests in the PJM queue, 7 active totaling 1,217.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 2.62 |
| MW capacity | 1.7 |
| MFO | 2.62 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.