Spotsylvania substation interconnection queue

2 active projects totalling 737 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
737active MW
6total filed
Queue IDProjectkVMWResourceStatus
C01-1370 Spotsylvania 500 kV 500 400 Battery Active
AC1-158 Spotsylvania Energy Center 500 337 Solar In Service
AD2-193 Spotsylvania 500 kV 500 208.5 Solar Withdrawn
AE1-047 Spotsylvania 500 kV 500 208.5 Solar Withdrawn
AI2-183 Spotsylvania 500kV 500 123.8 Solar Withdrawn
AG2-318 Spotsylvania 115 kV 115 75 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.