Substation Scout

St. Johns 34.5 kV

PJM queue ID C01-1891

St. Johns 34.5 kV (C01-1891) is listed in the PJM interconnection queue as a 8.8 MW solar project in Caroline County, VA. The filing names St. Johns as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.

Queue IDC01-1891
Project nameSt. Johns 34.5 kV
Status (as published)Active
SubstationSt. Johns
Point of interconnectionSt. Johns 34.5 kV
CountyCaroline
StateVA
Voltage34.5 kV
Capacity8.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-10-31
Source datasetcycle

Same substation and county

St. Johns substation: 10 requests in the PJM queue, 1 active totaling 8.8 MW.

Queue IDProjectMWResourceStatus
AI2-038St. Johns 115kV90SolarWithdrawn
AF2-035Anna River Solar48SolarWithdrawn
AG1-541St. Johns 115 kV32BatteryWithdrawn
AE2-231St. Johns 115 kV26.4SolarWithdrawn
AF2-300St. Johns 115 kV12SolarWithdrawn
AG1-073St. Johns 115 kV12SolarWithdrawn
AG1-074St. Johns 115 kV12SolarWithdrawn
C01-1894St. Johns 34.5 kV6.3SolarWithdrawn
AC1-115St. Johns 115kV5.7SolarWithdrawn

Caroline, VA: 62 requests in the PJM queue, 14 active totaling 964.7 MW.

A substation with the same name is named in PJM transmission planning materials: St. Johns (DOM, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperOriden LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy35.0
MW capacity8.75
MFO35.0
Submitted date4/27/2026
Last updated6/16/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first