Spotsylvania, VA interconnection queue

7 active projects totalling 1,787 MW in the PJM queue, plus 10 with terminal status (shown greyed).

7active projects
1,787active MW
17total filed
Queue IDProjectkVMWResourceStatus
C01-1370 Spotsylvania 500 kV 500 400 Battery Active
C01-2164 New Post - Tributary 230 kV 230 400 Battery Active
AC1-158 Spotsylvania Energy Center 500 337 Solar In Service
AI1-018 Spotslvania 500 kV 500 300 Battery Withdrawn
C01-1498 Spotsylvania - North Anna 500 kV 500 240 Battery Active
AD2-193 Spotsylvania 500 kV 500 208.5 Solar Withdrawn
AE1-047 Spotsylvania 500 kV 500 208.5 Solar Withdrawn
AH1-263 Chancellor 115 kV 115 200 Battery Active
C01-1497 Spotsylvania - North Anna 500 kV 500 160 Solar Active
AI2-183 Spotsylvania 500kV 500 123.8 Solar Withdrawn
AI2-038 St. Johns 115kV 115 90 Solar Withdrawn
AG1-133 North Anna-Ladysmith 500 kV 500 76.8 Solar Withdrawn
AG2-318 Spotsylvania 115 kV 115 75 Battery Withdrawn
AH1-251 Tavern Energy LLC 115 50 Battery Active
AH1-457 Moran DP – Flatcreek 115 kV 115 50 Battery Withdrawn
AH1-456 Moran DP – Flatcreek 115 kV 115 48 Solar Withdrawn
AH1-250 Todds Tavern- Spotsylvania/Goldsdale 115kV 115 36 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.