Substation Scout

Todds Tavern- Spotsylvania/Goldsdale substation interconnection queue

1 active project totalling 50 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
50active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-251 Tavern Energy LLC 115 50 Battery Active
AH1-250 Todds Tavern- Spotsylvania/Goldsdale 115kV 115 36 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.