Shands Energy Center
PJM queue ID AE2-040
Shands Energy Center (AE2-040) is listed in the PJM interconnection queue as a 15.7 MW battery project in Sussex County, VA. The filing names Sapony as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2025.
| Queue ID | AE2-040 |
|---|---|
| Project name | Shands Energy Center |
| Status (as published) | In Service |
| Substation | Sapony |
| Point of interconnection | Sapony 34.5 kV |
| County | Sussex |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 15.7 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2025-12-31 |
| Source dataset | serial |
Same substation and county
Sapony substation: 7 requests in the PJM queue, 2 active totaling 29.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-025 | Sapony 34.5kV | 13.8 | Solar | In Service |
| AD1-034 | Sapony 230 kV | 44.9 | Solar | Withdrawn |
| AH2-268 | Sapony 34.5 kV | 33.7 | Hybrid | Withdrawn |
| AI2-033 | Sapony 34.5kV | 24 | Solar | Withdrawn |
| AG2-431 | Sapony 34.5 kV | 12.5 | Solar | Withdrawn |
| AG1-393 | DW-Lew Jones Solar | 12 | Solar | Withdrawn |
Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15.7 |
| MW capacity | 15.7 |
| MFO | 15.7 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.