Shands Energy Center

PJM queue ID AE2-040

Shands Energy Center (AE2-040) is listed in the PJM interconnection queue as a 15.7 MW battery project in Sussex County, VA. The filing names Sapony as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2025.

Queue IDAE2-040
Project nameShands Energy Center
Status (as published)In Service
SubstationSapony
Point of interconnectionSapony 34.5 kV
CountySussex
StateVA
Voltage34.5 kV
Capacity15.7 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2025-12-31
Source datasetserial

Same substation and county

Sapony substation: 7 requests in the PJM queue, 2 active totaling 29.5 MW.

Queue IDProjectMWResourceStatus
AB2-025Sapony 34.5kV13.8SolarIn Service
AD1-034Sapony 230 kV44.9SolarWithdrawn
AH2-268Sapony 34.5 kV33.7HybridWithdrawn
AI2-033Sapony 34.5kV24SolarWithdrawn
AG2-431Sapony 34.5 kV12.5SolarWithdrawn
AG1-393DW-Lew Jones Solar12SolarWithdrawn

Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy15.7
MW capacity15.7
MFO15.7

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first