Reams substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Reams as the point of interconnection, all in Dinwiddie County, VA.
Target commercial operation dates as filed run from Dec 2021 to Dec 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-249 | Reams 115 kV | 115 | 40.1 | Hybrid | Withdrawn | Dec 2021 |
| AB2-160 | Reams Solar | 115 | 30.4 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Dinwiddie County, VA
- Carson - Rawlings: 5 active, 2,205 MW of 6 filed
- Carson: 2 active, 200 MW of 3 filed
- Clubhouse-Sapony: 1 active, 89 MW of 2 filed
- Sapony: 2 active, 29.5 MW of 7 filed
- Locks: 1 active, 0.2 MW of 3 filed
- Carson-Rawlings: none active of 2 filed
Site Scanner